On October 22, Liao Jiasheng, Chairman of the Group, held a working meeting with Liu Qiong, Director of the National Energy Conservation Center, at the Group’s headquarters.
On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
On June 27, the post-disaster well-drilling project in Zimbabwe—undertaken by China Geo-engineering Corporation (CGC)—successfully passed its midterm inspection and was rated “excellent”.
Recently, Song County in Henan, which receives targeted support from CECEP, was struck by extreme rainfall, with some areas recording up to 212.5 mm.
On June 16, CECEP Wind-power signed an agreement with Shanghai Fengling Renewables to jointly develop a 2GW green energy project in Serbia.
Recently, the Central Rural Work Leading Group released its 2024 effectiveness assessment report on central government agencies’ targeted assistance programs.
On June 19, the Embassy of the People’s Republic of China in the Kingdom of Saudi Arabia and the Contact Office of Chinese Companies in Saudi Arabia (COCC) held the 2024 COCC annual meeting in Riyadh.
第  23  /  33  页  总条数: 161
Produced By CMS 网站群内容管理系统 publishdate:2026-03-25 13:48:35