Recently, the Ministry of Commerce announced a new list of enterprises authorized to implement foreign technical assistance projects. After a rigorous selection process, CGC was granted, for the first time, qualifications in both the land and resources sector and the technical support sector.
On January 8, CGC formally signed a contract with the Road Development Agency (RDA) of Zambia for the 100-kilometer Isoka–Muyombe road upgrading project in Muchinga Province, marking a new breakthrough in the company’s sustained expansion in the infrastructure construction market of Southern Africa.
Recently, CECEPEC, a subsidiary of CECEPHK, jointly released the fourth Chiyu Fujian–Hong Kong ESG Index Report with Chiyu Bank.
On October 22, Liao Jiasheng, Chairman of the Group, held a working meeting with Liu Qiong, Director of the National Energy Conservation Center, at the Group’s headquarters.
On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
第  23  /  41  页  总条数: 205
Produced By CMS 网站群内容管理系统 publishdate:2026-06-17 09:24:24