On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
From June 23 to 24, Liu Dajun, the deputy Party secretary of the Group, traveled to the Xizang Autonomous Region’s Department of Housing and Urbanrural Development to convey greetings to cadres serving there on secondment and to conduct evaluations for those whose assignments are ending.
On June 17, Liao Jiasheng, Party Secretary and Chairman of CECEP, traveled to Yangjiang in Guangdong Province to hold a working discussion with Lu Yixian, Party Secretary of the Yangjiang Municipal Committee.
On June 5, marking the 54th World Environment Day, CECEP Jiangxi Branch launched coordinated awareness campaigns across its industrial wastewater treatment plants.
CECEP Solar Zhenjiang Branch drew significant attention with its immersive exhibition themed "Comprehensive Module Portfolio and Integrated Energy-saving Solutions" at the 15th China International Clean Energy Expo, recently held at the Beijing National Convention Center.
TBEA Xi’an Industrial Park Phase III and 5G Digital Factory and Technology Innovation R&D Building Construction Project - Anti-static Wear-resistant Flooring for 3A Plant, designed by CQEC, has been awarded the Gold Award at the 2024 WOCA Awards.
第  26  /  34  页  总条数: 169
Produced By CMS 网站群内容管理系统 publishdate:2026-04-16 10:20:14