On June 17, Liao Jiasheng, Chairman of CECEP, and Zhang Shirong, General Manager, visited Tianjin and met with Zhang Gong, Mayor of Tianjin.
Recently, the Engineering Company under CNEPG successfully passed the scientific and technological achievement evaluation organized by the China Association of Urban Environmental Sanitation for its self-developed AI Smart Combustion System V1.0, which was recognized as a domestically leading technological achievement.
On June 12, CGC’s Southern Africa Branch officially signed the Engineering, Procurement and Construction (EPC) contract for the Kananga River-Crossing Box Culvert Project in Zambia’s Southern Province with Ever Great Energy Company Ltd.
On the morning of June 10, the 2026 Shanghai International Carbon Neutrality Expo on Technologies, Products and Achievements opened at the Shanghai New International Expo Centre under the theme “Zero-Carbon Transformation, Empowered by Key Factors”.
On the afternoon of June 10, Liao Jiasheng, Chairman of CECEP, visited Tongji University and held a working meeting with Yang Jinlong, President of Tongji University.
Recently, CECEP’s first Wind Power + Rural Revitalization project—the CECEP Song County Jiugao Town Wind Farm Project—was successfully connected to the grid.
On June 3, CGC successfully signed the design-and-build contract for the CHIPATA–LUNDAZI section of the M12 Road in Zambia’s Eastern Province.
From June 4 to 5, Liao Jiasheng, Chairman of CECEP, traveled to Xi’an to inspect CQEC, CECEP Xi’an Qiyuan Mechanical and Electrical Equipment, Qiyuan (Xi’an) Darong Environmental Protection Technology, CECEP Xi’an Ecological Environment Company, etc.
第  3  /  44  页  总条数: 217
Produced By CMS 网站群内容管理系统 publishdate:2026-07-07 16:19:29