On March 25, the 500 MW green power supply project for the industrial park in Qahar Youyi Front Banner (Xinghe County), Inner Mongolia, invested and constructed by CECWPC, officially commenced construction.
Recently, the list of demonstration sites for the Beautiful Cells initiative in Fuzhou City, Jiangxi Province was officially released.
On March 20, CECEP held the first session of the 2026 CECEP Lecture Series, inviting Zhang Yuxian, former Director of the Economic Forecasting Department of the State Information Center and a member of the expert committee for the 14th and 15th Five-Year Plans, to deliver a special lecture.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
Recently, Wind, a leading domestic ESG (Environmental, Social and Governance) rating agency, released its 2025 results, recognizing CECEP Guozhen’s outstanding ESG performance with an upgraded AA rating — a historic leap of two levels.
第  38  /  56  页  总条数: 277
Produced By CMS 网站群内容管理系统 publishdate:2026-10-28 17:09:30