On the afternoon of November 19 local time, a side event themed “Green and Low-Carbon Actions of Central SOEs Under the Dual-Carbon Goals” was successfully held at the China Pavilion during the 30th Session of the Conference of the Parties (COP30) to the United Nations Framework Convention on Climate Change in Belém, Brazil.
On November 26, CECEP convened a special meeting to plan and advance its work on artificial intelligence. After hearing reports on progress in AI-related work, the meeting made detailed arrangements.
On November 26, Liao Jiasheng, Chairman of the Group, met with Viktor Khmarin, Chairman of the Management Board and General Director of RusHydro, at the Group’s headquarters for in-depth discussions on advancing practical cooperation.
On April 24, two infrastructure projects constructed by China Geo-engineering Corporation– the 12-city Water Supply Project in Côte d’Ivoire and the Marakabei-Monontsa Asphalt Road Upgrade Project in Lesotho – were selected as 2024 "Small yet Impactful" Model Demonstration Projects by the China International Contractors Association (CHINCA).
On April 27, 2025, His Excellency Khalid Al-Salmi, President of Saudi Arabia's Royal Commission for Jubail and Yanbu (RCJY), inaugurated the trial operation of the Ras Al-Khair Industrial City Medical Clinic and inspected ongoing projects constructed by China Geo-engineering Corporation in the industrial zone.
A pivotal meeting to advance the construction of artificial intelligence (AI) datasets in the green and low-carbon sector was held in Nanjing, Jiangsu Province on April 17. Organized by CECEP, the lead coordinator of the initiative, the event brought together 13 central state-owned enterprises (SOEs) to sign a joint pledge establishing a green and low-carbon data industrial consortium.
In a bid to ignite scientific curiosity, enhance inquiry skills and foster innovation among youth, Yunding Mountain Wind Farm – operated by CECEP Wind-power – partnered with Muma Middle School of Jiange County for an immersive educational event titled "Exploring Clean Energy at Yunding Mountain" on March 24.
On the afternoon of April 18, the Group convened a special session of its Leading Group for the CECEP Yangtze River Economic Belt Pollution Control Main Platform.
第  43  /  49  页  总条数: 241
Produced By CMS 网站群内容管理系统 publishdate:2026-08-20 11:00:07