CECEP Guozhen Intelligent Equipment successfully shipped 24 self-priming spiral aerators to the United Kingdom recently.
China Geo-Engineering Corporation (CGC), through its Togo-Benin branch, recently signed the contract for Lot 1 of the drinking water supply project for Kara and surrounding areas.
The Giseke Irrigation Project, contracted by China Geo-engineering Corporation (CGC), officially began construction on September 23 in Gisagara District in Rwanda’s Southern Province.
On September 9, the first CECEP Employee Basketball Tournament came to a successful close at the Ditan Gymnasium in Beijing.
On the afternoon of September 9, Liao Jiansheng, chairman of CECEP, held a working meeting with Wang Haimin, chairman of China Resources (Holdings) Company Limited (CRC), in Hong Kong.
On September 1, CECEP's largest-capacity wind turbine to date, a 10 MW unit, was successfully hoisted for the first time at the CECEP Qahar Right Front Banner 500 MW Industrial Park Green Power Supply Project.
On September 7, Liao Jiansheng, chairman of CECEP, conducted business research in Shenzhen. Zhu Qingfeng, chief accountant of the Group, accompanied him.
The opening ceremony of the 2026 Taiyuan Energy Low Carbon Development Forum was held in Taiyuan on the morning of September 4.
第  7  /  58  页  总条数: 288
Produced By CMS 网站群内容管理系统 publishdate:2026-11-18 10:36:00