Recently, the 200 MW/800 MWh Luzimiao Independent Energy Storage Power Station in Inner Mongolia, invested in and developed by CECEP, successfully completed three full charge–discharge cycles, marking the official full-capacity grid connection of the Group’s first and largest independent energy storage project.
On December 27, the China Federation of Industrial Economics held the Fourth China Industrial Carbon Peak Forum in Qingdao, at which CECEP was included in the 2025 China’s Top Runner for Industrial Carbon Peaking list. Du Le, Deputy General Manager of CECEP, attended the forum by invitation and delivered a keynote speech.
As winter heating demand peaks, CECEP’s renewable energy subsidiaries are resolutely fulfilling their responsibility to ensure energy security.
On September 17, during the 22nd China–ASEAN Expo, Liao Jiasheng, Chairman of the Group, held talks with Tea Kong, Vice Minister of Interior of the Kingdom of Cambodia, in Nanning, Guangxi.
Recently, the 2025 Enterprise New Quality Productive Forces Development Conference, hosted by the China Enterprise Reform and Development Society, concluded in Guangzhou.
On September 18, China Geo-engineering Corporation (CGC) signed a contract with Mozambique’s Water Supply Asset and Investment Fund (FIPAG) for the rehabilitation and expansion of the water supply system in Tofo tourism area of Inhambane Province.
On September 17, the 22nd China-ASEAN Expo and the China-ASEAN Business and Investment Summit opened in Nanning, Guangxi Zhuang Autonomous Region.
From September 8 to 11, at the 8th Central SOE QC Team Achievement Contest, CECEP Solar Energy Technology (Zhenjiang) Co.,
第  25  /  41  页  总条数: 205
Produced By CMS 网站群内容管理系统 publishdate:2026-06-17 09:24:25