On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
Recently, CECEP Digital Technology Co., Ltd., a subsidiary of CECEP Data Co., Ltd., has fully integrated the DeepSeek large AI model into its intelligent assistant for the ecological environment industry, marking a comprehensive upgrade of the platform.
The Guangming International Equestrian Center, a major cultural and sports project in Shenzhen designed by Shenzhen Machinery Institute Architectural Design (hereinafter referred to as MIDSZ, a subsidiary of CQEC), recently achieved structural completion.
On February 13, Cao Huabin, Deputy General Manager of CECEP, met with a delegation led by Roberto Azevêdo, Council Member of the Shenzhen Court of International Arbitration and former Director-General of the World Trade Organization (WTO), and Yang Lin, Founding Partner of Yingke International, at CECEP headquarters in Beijing.
On February 7, Song Xin, Party Secretary and Chairman of CECEP, met with Ma Yongsheng, Party Secretary and Chairman of Sinopec, at CECEP headquarters in Beijing. The two leaders discussed deepening collaboration to implement national strategies, uphold the responsibilities of central state-owned enterprises, and advance practical, multi-sectoral cooperation.
On January 20, the Central Asia Branch of China Geoengineering Corporation (CGC) officially received the acceptance certificate for the LOT-6 section of Georgia’s Marneuli Water Supply Project from the United Water Supply Company, marking the successful completion, handover and start of the warranty period for this critical phase.
第  42  /  44  页  总条数: 217
Produced By CMS 网站群内容管理系统 publishdate:2026-07-07 16:19:42